Build a house in Nigeria from abroad, and watch every block go in.

Stage payments released only after each stage is inspected, an open-book bill of quantities, and a live site camera, so you can manage your build from London, Houston, Toronto or Sydney.

No obligation. No payment required to speak with us. RC 1484495.

Artemis Atelier construction project

The question every diaspora client asks

“If I send money to Nigeria, how do I know the work is actually being done?”

Will they disappear with my money?

You never pay ahead of the work

Each payment covers one stage. It is only due after our inspection team has checked the previous stage, and you can bring in an independent inspector too.

Will they inflate the cost of materials?

Every cost is on an open book

An itemised BOQ: every bag of cement and tonne of rebar, checkable against our live material price tracker.

Will they use inferior materials?

Materials are inspected, not assumed

Rebar sizes, block quality and concrete cube tests are checked at the stage gates.

Is the project actually progressing?

You can see the site any day

A live camera, dated weekly reports, drone or video walk-rounds, and your own client portal.

Building from abroad

Build in Nigeria from anywhere, in six steps

You make the decisions from where you live. We do the work on the ground and show you the proof at every step.

LondonUKNew YorkUS EastTorontoCanadaLagosWAT · UTC+1
  1. Step 1

    Free call

    Tell us your plot, budget and timeline, on video or WhatsApp at a time that suits your time zone.

  2. Step 2

    Land and site check

    Send the documents. We check the plot, access and soil, and work with your lawyer on the title.

  3. Step 3

    Design and approvals

    Approve the design and 3D visuals on video calls. We prepare the drawings and permit application.

  4. Step 4

    BOQ and contract

    Review every line of the open-book BOQ, then sign a contract with stages and inspections built in.

  5. Step 5

    Build, watched live

    Follow the live camera and weekly reports. Pay each stage only after it has been inspected.

  6. Step 6

    Handover

    Receive the keys, as-built drawings, certificates and a 6–12 month defects period.

Calls are booked Monday to Saturday, 09:00–17:00 Lagos time. Lagos has no daylight saving, so the gap to London and North America changes by an hour twice a year.

Your building-from-abroad toolkit

Everything to know before you send a naira

How we buildThe six stages, what the inspector checks, and what you receive.Read the guide →What it costs in 2026Bungalow and duplex costs in naira, pounds and dollars.Read the guide →Buying land from abroadC of O, Governor’s Consent, searches and red flags.Read the guide →Scams to avoidThe ten that cost diaspora builders most, and the defence for each.Read the guide →Managing a build remotelyWho does what, reporting, site visits and change control.Read the guide →Choosing a contractorRegistrations to check and twelve questions to ask.Read the guide →

How your money is protected

Five layers between your money and the site

Each layer catches what the one before might miss. Together they mean you never pay for work you haven’t seen.

Your money
  1. Stage payments

    You pay for one stage at a time, never ahead of the work.

  2. Inspection

    Every stage is checked before you pay: by our team, an independent firm, or your own inspector.

  3. Open-book BOQ

    Every bag of cement and tonne of rebar itemised, so you can compare with market prices.

  4. Insurance

    Contractor’s all-risk cover with a NAICOM-licensed insurer you choose, in your name.

  5. Written contract

    Scope, payments, changes and disputes agreed in writing before work starts.

Your site
Insurance cover depends on the policy issued. Your signed contract sets the payment schedule and inspection plan.

Inspection before every payment

Who checks your build? You choose.

Every stage is inspected before you pay for the next one. Use our team, add an independent firm, bring your own inspector, or combine them.

Option A · Included in every build

Our inspection team

Checks each stage against the drawings and sends you the report before the next payment is due.

  • Engr. J.O. Owolabi · Chief inspector
  • Arch. E.A. Nwabueze · Adjunct inspector
  • Engr. Bello Hasani · Inspector

Option B · Independent of Artemis

An independent firm from our panel

Choose one of three to four outside COREN-registered firms to check the stages you want, for a second opinion that doesn’t work for us.

  • Panel firm · being appointed · Structural and concrete works
  • Panel firm · being appointed · Building services (electrical and plumbing)
  • Panel firm · being appointed · General building and finishes
  • Panel firm · being appointed · Quantity surveying and valuations

Firms are named here as each agreement is signed.

Option C · Your choice

Bring your own inspector

Any qualified engineer or surveyor you choose. We give them site access at each stage gate and share the drawings and bill of quantities; their fee is paid by you.

  • Your engineer, surveyor or architect
  • Site access at every stage gate
  • Drawings and BOQ shared with them

Whoever inspects, the rule is the same: no report, no payment. See the stage gates

Independent and client-appointed inspection fees are agreed separately. Inspection plans are written into your contract.

Reporting you can check yourself

What you see while we build

Not a relative’s phone photos: dated, regular evidence you can check from anywhere.

W1W2W3W4W5W6W7W8W9W10W11W12
Live site cameraAny time, on your phone
Weekly photo reportEvery week
Stage inspection reportAt every stage gate
Drone or walk-round videoAt key milestones
Your client portalStages, payments, documents
Illustration of a typical 12-week stretch of a build. Inspection dates follow the stages in your programme.

An extra layer of protection

Your project, backed by insurance.

Alongside our reporting and stage inspections, you insure your project with a NAICOM-licensed insurer of your choice. We give them the drawings, BOQ and programme they need, and the policy for contractor’s all-risk and public liability cover is issued in your name. The insurer and policy are confirmed in writing in your contract.

Coverage is subject to the terms, conditions, exclusions and deductibles of the policy issued. We walk you through exactly what is covered before your first payment.

See the evidence

  • Our inspection team: Engr. J.O. Owolabi (chief inspector); Arch. E.A. Nwabueze (adjunct inspector); Engr. Bello Hasani (inspector). You can also appoint an independent inspector of your choice to check any stage before you pay.
  • COREN registration: Engr. Utibe Collins Nneke — R.74112 · check the register

Depending on your project, cover may include

  • ✓

    Contractors’ all risks

    Physical loss or damage during construction.

  • ✓

    Third-party / public liability

    Claims involving injury or property damage to others.

  • ✓

    Construction plant and equipment

    Damage or loss of equipment used on your site.

  • ✓

    Fire and theft-related risks

    Depending on the specific policy issued.

Policies are issued by the insurer you choose, not by Artemis Atelier Ltd. You receive the policy number, coverage schedule and claims procedure directly.

What our clients say

★★★★★

“great company, you get what was promised.”
imade f. · berlin, Germany · 3 bed room, ifo · 2026

Free diaspora project consultation

Pick a time that suits your time zone

Takes two minutes. We confirm by WhatsApp or email within one working day.

1 · Pick a time (optional)

Times shown in your time zone. We take calls Monday to Saturday, 09:00–17:00 Lagos time.

2 · About you and your project

Pound and dollar figures use ExchangeRate-API daily reference rate (2026-10-28).

Free, no obligation. We'll never ask you to send money before you've spoken with us. We use your details only to reply about your project — see our privacy policy.

Questions diaspora clients ask

Can I build a house in Nigeria while living in the UK, US or Canada?
Yes. Most of our diaspora clients never need to be on site. You approve the design and BOQ on video calls, pay per inspected stage, and follow the build through a live camera, weekly reports and your client portal.
Will you disappear with my money?
You never pay ahead of the work. Each payment covers one stage and is only due after the previous stage has been inspected: by our team, an independent firm from our panel, or an inspector you appoint yourself. We are a registered company (RC 1484495) with an office you can visit at 70B Olorunlogbon Street, Anthony Village, Lagos.
Will you inflate the cost of materials?
Our BOQ is open-book: every bag of cement and tonne of rebar is itemised so you can compare it with market prices on our material price tracker.
How do I know the project is really progressing?
A live site camera you can open any time, dated weekly photo reports, inspection reports at each stage and video walk-rounds.
How much does it cost to build a house in Nigeria?
Roughly ₦150,000–₦450,000 per m² in Lagos in 2026, excluding land. See our cost guide in naira, pounds and dollars.
Can you help me check land before I buy?
Yes. We assess the plot, soil and access and work alongside your lawyer on the title. See buying land from abroad.
Which time zones do you work with?
All of them. We book calls Monday to Saturday, 09:00–17:00 Lagos time: mornings and early afternoons in London, early mornings in New York and Toronto, and evenings in Sydney.